Greenhouse

The remainder of the greenhouse arrived this week, but as the weather was not looking good first thing Saturday morning I bought a cheap concrete breaker and dug up the ugly part of the concrete slab.

greenhouse-base

With the skip full and the weather nicer we started assembling the greenhouse on the remaining part of the slab after lunch.  The slab is in a perfect position to have sun all day long.   We gave up at 18:30, both exhausted from moving all that concrete.

greenhouse-walls

The concrete moving caught up with us on Sunday. 🙂  1.5 days in the glass is in the sides and the roof started.   The instructions are terrible so we’re making it up as we go along from here.

roof-started

2.5 days in and the roof glass is mostly in.   It takes trained professionals 2.5 days to erect the greenhouse so we’re only a day out.  The scaffold tower base was really handy for installing the roof panels.

greenhouse-roof-glass

It took another day to finish the greenhouse.   I haven’t seen Kae since – I think she’s moved in there.   I still need to make some staging and fit some guttering to the rear where it drips on the fence.

greenhouse-finished

Next job is to finish the fence.  From there driveway then  finally the kitchen!