I’ve had a lot of work this year and the weather at the weekends hasn’t always been good for garden wall building. But the wall is nearly at half height – there are already 1500 bricks in there and I budgeted around 3500 bricks for the whole wall.
![](https://www.the-salutation.co.uk/blog/wp-content/uploads/2021/07/wall-near-half-height.jpg)
The wall is high enough to backfill the trench and I’ll be sore tomorrow having moved many tons of earth. The wall looks a lot taller from the garden side now it is no longer hidden by big piles of earth.
![](https://www.the-salutation.co.uk/blog/wp-content/uploads/2021/07/earth-backfill.jpg)
There was some excess earth left over. I suppose there would be after putting 4m cube of concrete in the hole for the foundations. It was good exercise filling the skip.
I have a bag of top soil but it’s not accessible until the skip is collected. Also my wheelbarrow has a flat tyre. Grass seeding will have to wait.
![](https://www.the-salutation.co.uk/blog/wp-content/uploads/2021/08/spoil-removed.jpg)